dna_plan 0.5.1
dna_plan: ^0.5.1 copied to clipboard
DNA layer: how a project is planned - the structure of a project management repo, its goals, requirements, concepts, tickets and quarters
dna_plan #
DNA layer: how a project is planned — the structure of a project management repo and the seven layers of product design.
What it ships #
doc/guides/pm-repo-guide.md— how a project management (PM) repo is structured; how goals and requirements are kept across quarters; and how tickets and quarters are planned in it.dna_gg's ticket workflow reads it when presentdoc/guides/requirements-guide.md— how the requirements are engineered together with the user, before any ticketdoc/guides/schedule-guide.md— how the requirements are cut into tickets, estimated and drawn as a Gantt chart against a target dateCLAUDE.md— tells the AI to engineer the requirements first and to offer a time plan; it lands in the managed block of the project'sCLAUDE.mdnext to the ones of the other layers (helix 1.13 or newer)- Skills:
/plan-introlists the planning skills and names the next step,/plan-requirementsruns the requirements engineering,/plan-schedulethe time plan
The guide plans with the seven layers of product design. Their guides and
the /layers-* skills live in
dna_design_layers; install
both layers to get the whole picture.
Layers #
Orthogonal: this layer carries only its own topic and is combined with the other layers by dna_ggdna. It declares no parent, and it must not — the umbrella lists every topic layer, so taking the umbrella back would close a cycle, and a parent here would reach every consumer of this topic whether that repo asked for it or not.
Variables #
dnaCopyrightHolder— the name in the license header of every file
Development #
The dna/ folder is hand-authored source and is never generated. The repo
instantiates its own DNA — run dart test after changes; commit first, a file
the DNA would overwrite must not carry uncommitted work.