disruptionBudget property
The maximum number (or percentage) of VMs per zone to disrupt at any given moment.
The number of VMs calculated from multiplying the percentage by the total
number of VMs in a zone is rounded up. During patching, a VM is considered
disrupted from the time the agent is notified to begin until patching has
completed. This disruption time includes the time to complete reboot and
any post-patch steps. A VM contributes to the disruption budget if its
patching operation fails either when applying the patches, running pre or
post patch steps, or if it fails to respond with a success notification
before timing out. VMs that are not running or do not have an active agent
do not count toward this disruption budget. For zone-by-zone rollouts, if
the disruption budget in a zone is exceeded, the patch job stops, because
continuing to the next zone requires completion of the patch process in
the previous zone. For example, if the disruption budget has a fixed value
of 10
, and 8 VMs fail to patch in the current zone, the patch job
continues to patch 2 VMs at a time until the zone is completed. When that
zone is completed successfully, patching begins with 10 VMs at a time in
the next zone. If 10 VMs in the next zone fail to patch, the patch job
stops.
Implementation
FixedOrPercent? disruptionBudget;