DVProgress class final
How far through a task is.
The specification says progress and cancellation are the typed events Background and Durable Work defines. That section defines none, so these are defined here and the jobs layer can adopt them rather than a second vocabulary appearing there later.
Constructors
- DVProgress(double fraction, {String? message})
-
const
Properties
Methods
-
noSuchMethod(
Invocation invocation) → dynamic -
Invoked when a nonexistent method or property is accessed.
inherited
-
toString(
) → String -
A string representation of this object.
override
Operators
-
operator ==(
Object other) → bool -
The equality operator.
inherited